Mt Watson Stage 1 "Operating cash flow at $3.5m per 10c above $3.90"
He's probably seen the ascending triangle that has formed on copper futures since May 2006 and it's ceiling at $4.00 with a test of that ceiling currently being actioned.
A break out of the $4 ceiling will put copper prices into play and increase cash flow for MRX.
Mt Watson stgae 2 due in October by which time Copper futures could/should be well in play above $4.00 all being well.
PP
MRX Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held