That is right, this one cannot be used used for commercial gain as well as r & d.
When the time comes to install a 15 MW array, an interconnect with the required capacity will be part of the project. Just as it would be if there was no wind farm there already.
- Forums
- ASX - By Stock
- 7 news
That is right, this one cannot be used used for commercial gain...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCE (ASX) to my watchlist