"All the generation has traditionally centred around the town of Collie and the coalfields with a whole lot of spindly lines run out of there. What that has meant is that as you get further away, the reliability of power supply becomes worse," he said.
https://www.wattelectricalnews.com/NEWS/Oil-and-gas-giant-Eni-flicks-the-switch-on-solar/43565
I am guessing many of the SPS will be installed somewhere on these “long spindly lines.”
It will take a helluva lot of renewable energy and storage to replace the capacity lost from Muja AB.
https://thewest.com.au/news/wa/coll...se-in-multi-million-dollar-loss-ng-b88597943z
- Forums
- ASX - By Stock
- CCE
- 60 x SPS
60 x SPS, page-31
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCE (ASX) to my watchlist