CCE 2.56% 4.0¢ carnegie clean energy limited

Registration of Interest: Electricity Network Project |...

  1. 11,120 Posts.
    lightbulb Created with Sketch. 108
    Registration of Interest: Electricity Network Project | Stand-alone Power Systems

    We have identified 60 locations in regional Western Australia, where stand-alone power systems can be introduced.

    Stand-alone power systems are hybrid systems which utilise renewable energy, batteries, inverters and back-up diesel generators to produce and store electricity, without physically being connected to the existing network. Improving efficiency and reliability for customers.

    The Requirements

    We are seeking registrations of interest for one of the following project requirements:

    • Requirement A: Supply, Install, Commission, Operation and Maintenance
    • Requirement B: Supply, Install and Commission
    • Requirement C: Operation and Maintenance only
    • Requirement D: Provide a holistic service capability of a portfolio management solution to deliver all above requirements
    Supply, Install & Commission includes:

    • Design, supply, installation and commissioning of complete stand-alone power system to the required specifications.
    • The systems will be a mixture of capacities ranging from <5kWh per day to 60kWh per day.
    Operate and Maintain includes:

    • Operation and maintenance of installed units, for an initial period of 12 months.
    • Inspection, testing and preventative maintenance of the equipment.
    • Remote monitoring.
    • Respond to faults within an agreed timeframe.
    The Proposal

    To be considered for the inclusion in an Expression of Interest, please register your interest by 12 April 2018 using the below form.

    Please ensure to include the following information:

    • ‘Reason for Registration’ section - select 'in response to an advertised bid' and title of the procurement event: WS1227200386 Stand-alone Power System Project.
    • Registration of your interest for either requirement A, B, C or D.
    • Description of relevant areas of expertise.
    • Geographical reach within the South West Interconnected Network.
 
watchlist Created with Sketch. Add CCE (ASX) to my watchlist