EPR 0.00% 0.7¢ essential petroleum resources limited

the 3D Seismec data was positive, drilling will commence as...

  1. 4,655 Posts.
    lightbulb Created with Sketch. 415
    the 3D Seismec data was positive, drilling will commence as scheduled in Dec 2008 as long as weather conditions allow, .
    Beach are to drill the FERMAT AREA first. regarding east wing final analysis of estimate ,4 to 6 weeks
    when company takes the time to respond to shareholders enquiry its a positive, hopefully the drilling will prove up some of that 2 trillion cubic feet estimate of gas.
 
watchlist Created with Sketch. Add EPR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.