Another box ticked.
The increase in Measured/ indicated is good as this is the basis for Proven/Probable for the ore reserve. Loosk like a 5 - 6 year mine life on this drilling, without any more drilling along the strike/dip. That will surely add more years!
The grade/ cut off is similar to others , eg VML.
The strip ratio is low so the cost of ore delivered to the ROM pad should be low.
Ore reserve to come.
Another box to tick, and then!
DYOR