Per AVQ announcement today and also the limonite close to the surface are well below their cutoff.
"Drilling will continue throughout 2019 and additional drill rigs are currently being sourced to increase drilling productivity in anticipation of a ramp up in mining activity in 2019."
"Hi Fe Limonite: 1.6% Ni cut-off and 48% Fe ≥ 2m thickness."