14D 0.00% 3.8¢ 1414 degrees limited

sewerage generated methane gas TESS soon to be installed at...

  1. 54 Posts.
    lightbulb Created with Sketch. 2
    sewerage generated methane gas TESS soon to be installed at Glenelg Sewage plant SA to generate power and heat incoming Sewage to increase bacteria activity. Power and Heat generation by gas by product. That should be a winner!!!
 
watchlist Created with Sketch. Add 14D (ASX) to my watchlist
(20min delay)
Last
3.8¢
Change
0.000(0.00%)
Mkt cap ! $16.67M
Open High Low Value Volume
3.8¢ 3.8¢ 3.8¢ $3.938K 103.6K

Buyers (Bids)

No. Vol. Price($)
1 90000 3.9¢
 

Sellers (Offers)

Price($) Vol. No.
4.0¢ 92615 2
View Market Depth
Last trade - 09.59am 04/12/2024 (20 minute delay) ?
14D (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.