AMD could someone tell me if these results are good? The work...

  1. 147 Posts.
    lightbulb Created with Sketch. 1
    AMD could someone tell me if these results are good?

    The work completed to date has been overwhelmingly successful, having confirmed mineralisation at all five prospects and enhanced the understanding of the regional and local geology (Figure 6). Significant gold results include: ➢ 15m @ 1.5g/t Au including 3m @ 6.7g/t Au (T1 prospect); ➢ 48m @ 0.7g/t Au including 21m @ 1.1g/t Au (T2 prospect); ➢ 27m @ 0.6g/t Au & 18.7g/t Ag including 7m @ 1.0g/t Au & 59.3g/t Ag (T6 prospect); and ➢ 27m @ 0.6g/t Au including 1m @ 9.0g/t Au (T8 prospect). In addition to the prospects drilled in 2017, there remains over 50 strike kilometres of gold anomalism at the Project which is yet to be drill tested.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.