BBX 0.00% 24.0¢ bbx minerals limited

“We're 1-2 months out from the first photo. We’re definitely...

  1. 11,185 Posts.
    lightbulb Created with Sketch. 2609
    We're 1-2 months out from the first photo. We’re definitely within your 3 month window IMO.”

    The exploration update says they have recently engaged archeological consultants to prepare reports for the trial mining licence.

    According to the timeline you posted (above), after the permits are obtained they still need to do the final engineering and plant design and establish the mine infrastructure on site.

    It doesn’t seem to me like we are definitely within my 3 month time frame.

    Can you please explain if the smelter itself is being built onsite and how much you expect it to cost together with the other mine site infrastructure and also how much additional money will need to be raised to complete the trial plant project?

    Eahmun
    Last edited by eshmun: 09/10/18
 
watchlist Created with Sketch. Add BBX (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.