Cap raise must be close. $762K end of Q2, $360K projected for Q3. Be good to have assay process sorted and leverage off that for the raise to fund a JORC resource, scoping study and fast track the pilot plant.
AN1 CuFe sells its Crossroads gold royalty to Northern Star for $4M cash; says better than waiting for mine launch
Week 46 Wrap: Copper hits 2mth low as Trump threatens net zero pace; US rally fades; HotCopper’s picks