Hi ryrie12
Last I heard a few weeks back WDS were doing it tough and achieving 15-20 total metres per week against a contract rate of 45-50m week across the two drifts. Have peaked occasionally at contract rates but had weeks of zero too. Job is looking to take over a year longer than planned which is going to hurt somebody's bottom line ... Safety stats aren't great either.