"Since being recommissioned, Muja AB has been plagued by operational and reliability problems, producing power just 20 per cent of the time on average."
https://thewest.com.au/news/wa/coll...se-in-multi-million-dollar-loss-ng-b88597943z
The closure of such a major asset, should have a knock on effect for the owners of the new generators being built.
- Forums
- ASX - By Stock
- CCE
- 1.2 MW Solar Photovoltaic System for the ADSCS
1.2 MW Solar Photovoltaic System for the ADSCS, page-19
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CCE (ASX) to my watchlist