Perforation and flow testing was completed early last week apparently - results should be soon.
They are just setting up and testing completion tools. (Blow out preventer (BOP) and wellhead successfully tested to 1500psi. Completion tools will are to be setup and tubing tested to 2000 and the manifold tested to 3000 psi.)
Test crew is at work and will take as long as it takes. Hopefully the massive pressure blows the BOP. :)