Hi Kentbrock,
Part of the latest announcement from Kea (feb 3) includes the following:
"Kea has also opted to use the Drillforce rig to install the top section of conductor casing at the Mauku-1 well site in Kea's ofshore Taranaki permit area PEP38124 in preparation for the main drilling phase".
At last we are going to soon get some action. Good Luck Mate.
Klaas