Have a look at how long it is taking EQX to get results to the market from it's drilling campaign. They started drilling at the beginning of April and there and no results have been made public as yet. That's 3 months.
It took LEG 3 months after the re-commencement of their drilling program to get metallurgy results, then another 3 months on top of that for confirmation through diamond drill assays.
I've sat through months and months of SDL drilling in the past.
West Africa is a harsh mistress, the terrain can be challenging to say the least, then samples need to be shipped elsewhere to be processed.
Has a drilling program been outlined that quotes what meterage they are looking to drill and the number of holes?