IDO 0.00% 0.3¢ indo mines limited

possible price target, page-2

  1. 195 Posts.
    the coal operation alone makes Indo Mines to an undervalued player. Production volume till August is 25 K/month and then 35 K/month. Next productiontarget is 50 K/month.

    In june, the production @ jogjakarta project will start and will generate additional revenue.

    The Mangkok mine is already in production, so i estimate the non operative costs a little bit lower than the non operative costs of jogjakarta pig iron project.

 
watchlist Created with Sketch. Add IDO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.