DMN 0.00% 0.1¢ datamotion asia pacific limited

realistic time estimates, page-2

  1. 601 Posts.
    Personally I think dmn will start by releasing it's 3d data first then drilling. It should take them 9 to 10 working days to drill or maybe even less.

    I don't really care about the 3d data(since it won't tell us anything except where to drill) the data suppose to show us the strongest gravity field for drilling!

    However I do care about the rock sample results. The company hasn't tell us anything about that yet.(to me it is stupid to spend 300,000 on drilling with out knowing the sample grades so obviously they know something and they haven't released it yet.

    All will come together IMO. Patients my friends. They have to get the timing right.
    First resistance is 0.005 IMO then 0.012 then 0.042! If you go back to monthly chart you will see there is a gap since long time ago which needs to be filled! :)
    Also monthly chart will show you spikes(at least two already) One was during IT boom and I think the third one will be this time.
    This alone shows me that dmn is not along term investment However they know how to do something extra ordinary occasionally

    Hope this helps
 
watchlist Created with Sketch. Add DMN (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.