AIV 31.3% 1.1¢ activex limited

potash , page-20

  1. 286 Posts.
    ASX Release ? 29 January 2009
    Maiden JORC Resource ? Lake Chandler Potash Project
    ActivEX (AIV:ASX) is pleased to announce its maiden resource for the Lake Chandler Potash
    Project. The project (Mining Lease - M77/22) is located 45 kilometres north of Merredin (300km
    east of Perth) in the wheatbelt of Western Australia. Potash extraction occurred at the site in the
    immediate post-war period.
    ActivEX Limited (?ActivEX?) has requested independent consulting geologists Hellman &
    Schofield Pty Ltd (?H&S?) of Sydney, Australia to complete a resource estimate for its Lake
    Chandler Potash Project in Western Australia. The reporting of these new resources is in
    accordance with the 2004 JORC Code. All resources are in the Inferred Resource category as
    follows:-
    Table 1 Lake Chandler Potash Project Inferred Resources
    Volume
    (m3)
    Tonnes
    K2O
    %
    3,611,891 5,779,025 5.73
    (significant figures does not imply precision, no cut off grade used; default bulk density of 1.6t/m3)
    Infill drilling is required to upgrade the Inferred Resource estimate to Indicated and Measured
    Resource categories.
    ActivEX is reviewing mining and treatment options for the deposit and production rates of
    150,000 to 300,000 tonnes per annum are being considered. At these rates a mine life of 20 to
    30 years is envisaged.
    Summary
    The potash mineralisation at Lake Chandler occurs as alunite (KAl3(SO4)(OH)6) mineralisation
    hosted in a flat lying evaporitic sequence (playa lake) of Recent age. ActivEX plans to review
    options to mine the potash deposit using an open pit operation and the resources have been
    classified on this assumption.
    The new resources are based on rotary air blast (RAB) and aircore drilling results from two
    exploration campaigns in the 1980s for a total of 112 holes. Drill hole spacing was
    approximately 200 by 50m (see figure below) with samples taken over 1m intervals to an
    average depth of 6m. Samples were assayed for K2O using fusion and AAS or ICP methods.
    Sample recoveries were recorded as ?good? during the drilling campaigns. Results from six
    twinned holes during the second aircore program indicate good correlation with the RAB
    drilling for the neighbouring mineral intervals. No analytical standards or duplicate samples
    2
    were collected during the drilling and no measurements of bulk density were made. A
    assumption for bulk density (in situ) of 1.6t/m3 has been used for the resources.
    A digital wireframe was created from a geological interpretation of the prospective grey and
    white alunitic clays. A total of 315, one-metre composites were used in the resource estimate
    with the data modelled using Ordinary Kriging. The resources were reported using the
    wireframe shape as a constraint with no K2O cut off grade. ActivEX plans to mine the whole
    deposit hence no cut off grade was used. A diagram of composite grade versus the block grade
    is included below for the 279m level. A historical resource estimate by previous explorers
    using a sectional polygonal method gave comparable results.
    3
    0.00 - 4.500
    4.500 - 5.500
    5.500 - 6.00
    6.00 - 6.500
    6.500 - 7.00
    7.00 - 100.00
    model extents
    K2O range
    blocks this layer only
    9200 9600 10000 10400
    19600
    20000
    20400
    20800
    Plan Plot of K2O
    RL slice: 279.0 +/- 0.5
    East
    North
    0.00 - 4.500
    4.500 - 5.500
    5.500 - 6.00
    6.00 - 6.500
    6.500 - 7.00
    7.00 - 100.00
    K2O range
    point data
    Univariate Statistics
    mean: 5.18579
    variance: 2.37653
    coef varn: 0.29727
    minimum: 1.6500
    1st quart: 4.100
    median: 5.600
    3rd quart: 6.400
    maximum: 7.800
    no. of data: 410
    Lake Chandler ? Block Grade Distribution and Drillholes 279m RL
    (local grid bearing 301?to MGA94 Zone 50).
    There is exploration potential for additional mineralisation peripheral to the current resource within the
    confines of the lake margin.
    Future work programs planned by the Company are designed to investigate optimum treatment methods,
    market potential of the products and the economics of the project.
 
watchlist Created with Sketch. Add AIV (ASX) to my watchlist
(20min delay)
Last
1.1¢
Change
-0.005(31.3%)
Mkt cap ! $1.293M
Open High Low Value Volume
1.6¢ 1.6¢ 1.1¢ $3.267K 262.5K

Buyers (Bids)

No. Vol. Price($)
1 29967 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.6¢ 272943 1
View Market Depth
Last trade - 15.47pm 27/11/2024 (20 minute delay) ?
AIV (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.