GWR 1.15% 8.8¢ gwr group limited

basic maths, page-9

  1. 109 Posts.
    Mining Equipment Fleet needed for this size open pit mine.

    1x Hydraulic Shovel $912,000
    1x Wheel Loader $718,000
    4x Rear Dump Truck $599,000 each = $2,396,000
    1x Rotary Drill (crawler) $598,000
    4x Crawler (Dozer) $297,000 each = $1,188,000
    1x Road Grader $447,000
    1x Water Truck $253,000
    3x Service Truck $158,000each = $474,000
    1x Shot Loader Truck $77,000
    1x Screening machine $260,000
    Miscellaneous $1,000,000

    TOTAL = $8,287,000

    Operating Costs per 8 hour day for machinery.
    Costs include- Maintenance, fuel, lube, tyres, wear.

    1x Hydraulic Shovel $592
    1x Wheel Loader $644
    4x Rear Dump Truck $1808
    1x Rotary Drill (crawler) $613
    4x Crawler (Dozer) $1064
    1x Road Grader $320
    1x Water Truck $248
    3x Service Truck $312
    1x Shot Loader Truck $152

    Total $5753 per day

    Wages- Based on 90k per year sallery.

    17x Drivers $5882
    5x Dogman $1730
    3x Service staff $1038
    1x Superviser $346
    2x miscellaneous $692
    Current Staff $14230

    TOTAL- $23,918 per 8 hour day


    Other Operating Costs per 8 hour day.

    Water -Blast, clean and screen approx 20,000 ltrs
    Fuel for generators and other machinery 300 ltrs
    Temporary accomidation , meals,personal hygene,
    Tools

    TOTAL approx $2000 per day


    Mining Equipment fleet cost $8,287,000

    Cost of mining per 8 hour day $31,671

    Still researching Costs for refinement and shipping also taking into account that they have to give Valin @ Yijian 5mt a year for 15 years a total of 75mt
    then you should be able to work out a total profit wich will give you your share price in 15 years.
 
watchlist Created with Sketch. Add GWR (ASX) to my watchlist
(20min delay)
Last
8.8¢
Change
0.001(1.15%)
Mkt cap ! $26.33M
Open High Low Value Volume
8.8¢ 8.8¢ 8.8¢ $4.413K 50.15K

Buyers (Bids)

No. Vol. Price($)
1 101176 8.5¢
 

Sellers (Offers)

Price($) Vol. No.
9.0¢ 50431 1
View Market Depth
Last trade - 12.55pm 28/11/2024 (20 minute delay) ?
GWR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.