EVG 0.00% 3.1¢ evion group nl

full steam ahead, page-11

  1. 23,765 Posts.
    lightbulb Created with Sketch. 258
    The construction manager is a French Canadian BJ told me he was lucky to get the guy for the project. be interesting to hear when they ship out the ISA mill from Australia as everything else mates into that. Really there is no reason for this to take a year to constuct as once the mill is in place its just a matter of hooking up a crusher on the front end and the albion tanks on the back end.
    Hopefullly they have a decent electircal contractor for putting in the trasformers and power supply . My experiance in Argentina with electrical contractors fitting out dairy factories there was not pleasant they didnt have a clue in reading blue prints and would put motors and wiring in with too small a capacity.

    From the Envirogold web site:

    "Jose Sena - Project Manager (Las Lagunas Gold Tailings Project)
    Jose Sena is Project Manager for the Las Lagunas Gold Tailings Project in the Dominican Republic. During the years 1984 to 1992, he held senior managerial positions at the Pueblo Viejo Gold Mine in the Dominican Republic, and was General Manager from 1989 to 1992. He is a qualified and experienced Mining Engineer, fluent in Spanish and English and is a resident of Santo Domingo.

    Jean-Pierre Leblanc Construction Manager
    Mr Leblance is a qualified mechanical engineer with more than 30 years experience in consulting engineering, construction contracting, and project management of industrial and mining process plans. Jean-Pierres experience has included Canada, the Middle East and Latin America, and he has recently successfully completed the construction of a copper/gold project in the Dominican Republic."
 
watchlist Created with Sketch. Add EVG (ASX) to my watchlist
(20min delay)
Last
3.1¢
Change
0.000(0.00%)
Mkt cap ! $7.980M
Open High Low Value Volume
3.3¢ 3.3¢ 3.1¢ $3.403K 107.3K

Buyers (Bids)

No. Vol. Price($)
1 38595 3.1¢
 

Sellers (Offers)

Price($) Vol. No.
3.3¢ 40000 1
Last trade - 15.08pm 29/11/2024 (20 minute delay) ?
EVG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.