The time period to fix the BOP comes up in the middle of next week, with Arwon to hit the zone of interest over that weekend-go baby!
Beeville, a slightly smaller Worrior look a like should be getting VPE's rig from the current drilling in PEL 115 around then.
In the meantime we should be getting an up date by the end of this week on the Derrilyn pipeline tie in.
Lovely stuff in a rampant oil market.
Cheers,TAS