SRK 6.45% 3.3¢ strike resources limited

monkey buy at 57.5/58, page-49

  1. 53,839 Posts.
    lightbulb Created with Sketch. 33
    Have you had a look at Indonesian Project (thermal coal) - notice the CAPEX.

    "The study has confirmed that the Berau Project has the potential to generate an annual operating surplus of approximately US$33m, with:

    • total capital cost of approximately US$19m;

    • average operating costs of approximately US$41 per tonne;

    • a projected coal price of approximately US$52/tonne, FOB ship (current prices are approximately US$55-57/tonne);

    • 3 Mt peak production per year;

    • a run of mine coal product of medium calorific value of 5,400-5,600 kcal/kg GAR with low sulphur - 0.66%, as received (AR); ash - 7.3%, AR and total moisture - 16.6%, AR; and

    • a development timetable of 8 months from receipt of development approvals to production."

    11/06/09.
 
watchlist Created with Sketch. Add SRK (ASX) to my watchlist
(20min delay)
Last
3.3¢
Change
0.002(6.45%)
Mkt cap ! $9.931M
Open High Low Value Volume
3.3¢ 3.3¢ 3.3¢ $1.594K 48.31K

Buyers (Bids)

No. Vol. Price($)
2 100268 3.1¢
 

Sellers (Offers)

Price($) Vol. No.
3.2¢ 5000 1
View Market Depth
Last trade - 11.11am 18/11/2024 (20 minute delay) ?
SRK (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.