the Dulcie results are unspectacular (Cut off 0.4) looks like around a .8gram a ton Au laterite project for heap leaching
Looks to be a footprint of around 500,000 metres squared so could be a 100,000 ounce plus resource if they have 6 vertical metres of laterite
((500,000* .7grams)/31) *1.7SG =19000 ounces per vertical Metre
Advantage is guessing no strip and potential to heap leach.
- Forums
- ASX - By Stock
- SXG
- what is the hc record?
what is the hc record?, page-2
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)