EPR 0.00% 0.7¢ essential petroleum resources limited

epr and bpt pre open, page-9

  1. 4,655 Posts.
    lightbulb Created with Sketch. 415
    large volumes for BPT today, very misleading for EPR if the 25% is inacurate.
    Weekly Drilling Report
    Wednesday 17th December 2008
    Well
    Primary Targets
    BPT*
    50.00%
    Report Time:
    Waarre Fm (Unit C)
    VIC/P46
    EPR
    25.00%
    Depth:
    Flaxman Fm
    MIT
    25.00%
    Operation:
    Progress:
    BPT*
    75.00%
    Report Time:
    Namur Sst
    PPL 220
    COE
    25.00%
    Depth:
    Operation:
    Progress:
    BPT
    20.21%
    Report Time:
    Birkhead Fm
    STO*
    66.60%
    Depth:
    Hutton Sst
    ORG
    13.19%
    Operation:
    Progress:
    BPT
    30.00%
    Report Time:
    Hutton Sst
    STO*
    70.00%
    Depth:
    1771m (TD)
    Namur Sst (s)
    Operation:
    Basal Jurassic
    Progress:
    BPT
    23.20%
    Report Time:
    Patchawarra Fm
    STO*
    60.06%
    Depth:
    2332m (TD)
    Hutton Sst
    ORG
    16.74%
    Operation:
    Progress:
    BPT
    20.21%
    Report Time:
    Patchawarra Fm
    STO*
    66.60%
    Depth:
    951m
    Tirrawarra Sst
    ORG
    13.19%
    Operation:
    Progress:
    COAL SEAM GAS PROJECTS
    Well
    Depth
    PL 198
    BPT
    40%
    Tipton-144
    638.93m
    Coal Seam Develop't
    AOE*
    60%
    Tiipton-146
    28.89m
    * Operator
    (s) Secondary Targets
    BPT Beach Petroleum Ltd
    `
    C/E Basin, QLD
    951m
    Tirrawarra-74
    0600 hrs (CST) 17/12/2008
    PPL 20
    Gas Development
    Drilling ahead in the Early Cretaceous.
    Location
    Participants
    Operation: 0600hrs (EST) 17th December 2008
    AOE Arrow Energy NL
    COE Cooper Energy Limited
    EPR Essential Petroleum Resources Ltd
    MIT Mitsui E&P Australia
    ORG Origin Energy Resources LTD
    STO Santos Limited
    Fermat-1
    Zeus-1
    0600 hrs (CST) 17/12/2008
    0600 hrs (CST) 17/12/2008
    736m
    Oil Appraisal
    Gidgealpa-61
    C/E Basin, SA
    PPL 6
    Surat Basin, QLD
    Drilling surface hole.
    Tipton 146.
    Drilling ahead in the Westbourne Formation.
    C/E Basin, Qld
    Participants
    Weekly Progress & Summary
    well completed as future gas producer; rig moved to
    1661m
    0600 hrs (CST) 17/12/2008
    0600 hrs (CST) 17/12/2008
    Well is being cased as a future Patchawarra Formation
    1679m
    0800 (AEST) 17/12/2008
    999m
    736m
    Drilling ahead in the Early Cretaceous.
    1346m
    Well is being cased for further evaluation.
    Gas Exploration
    Pulling out of hole at 13.375" casing point.
    Otway Basin, Vic
    999m
    C/E Basin, QLD
    1399m
    Okotoko-3
    Oil Development
    Callawonga-5
    PL 83
    Gas Development
    C/E Basin, QLD
    ATP 259P (Total 66)
    Oil Exploration
    gas
 
watchlist Created with Sketch. Add EPR (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.