the 3D Seismec data was positive, drilling will commence as scheduled in Dec 2008 as long as weather conditions allow, .
Beach are to drill the FERMAT AREA first. regarding east wing final analysis of estimate ,4 to 6 weeks
when company takes the time to respond to shareholders enquiry its a positive, hopefully the drilling will prove up some of that 2 trillion cubic feet estimate of gas.