Hummms - I'd agree with your geologist friend.
There are some interesting things to note.
First, check out the cross-section provides, in particular to two highlighted drillholes.
What is apparent to me is where they cross - neither intersected vein shows up in both drillholes, which indicates lack of continuity.
The second point refers to note 1: "average air leg stoping" - this is the first time this has been mentioned, other than going to owner-operator.
Probably the only way to mine orebodies like this, HOWEVER with less dilution and more mining control comes lower productivity. And, broken ore cannot be retrieved from the stope until the mining is completed. A revamped mining schedule is required, but I doubt 60koz/yr is achievable.
And as Goldi would say, where are the financials??? What about cost controls and forecasts? If they aren't heading in the RIGHT direction then the announcement is just a smoke screen.
- Forums
- ASX - By Stock
- TAM
- good news for a change
good news for a change, page-6
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TAM (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $37.60M |
Open | High | Low | Value | Volume |
3.0¢ | 3.0¢ | 2.9¢ | $49.29K | 1.687M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 539189 | 2.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.0¢ | 202723 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 321404 | 0.040 |
2 | 202907 | 0.039 |
1 | 33000 | 0.036 |
1 | 50000 | 0.033 |
1 | 20000 | 0.032 |
Price($) | Vol. | No. |
---|---|---|
0.041 | 706406 | 1 |
0.044 | 23577 | 1 |
0.045 | 24750 | 1 |
0.046 | 215109 | 1 |
0.047 | 198000 | 3 |
Last trade - 12.05pm 04/12/2024 (20 minute delay) ? |
Featured News
TAM (ASX) Chart |