CAPEX AU$939,000,000 Processing Facility & Acid Contact and Regeneration Plants and an OPEX of AU$46.44 tonne mined.
Under directors comments:
(a): “The Opex is also below our initial target range but it will require additional costs added (including mining, power plant operation, borefield water, tailing disposal, campsite, and product transport and sales).”
CAPEX $939m
OPEX $46.44 tonne mined
5 mt/p.a
1.6 mt/p.a concentrate
Out of the 1.6 mt/p.a concentrate they extract all the percentages (%) as in appendix 1. If they do outsource the acid and regeneration plants constructed and operated under a BOOT (Build-OwnOperate-Transfer) facility. That could potentially reduce the CAPEX by 62% (Refer to pie chart) as shown in announcement and could theoretically reduce the CAPEX by $356m leaving the company with a $582m CAPEX, of course this then would increase the OPEX.
One thing that needs to be remembered is that KRR also has high grades of high purity alumina (Al2O3) which if they extract can generate a very lucrative profit depending on grade and tonnage. “KRR has ambitions to produce at least 5 high purity metal products, including high purity alumina (HPA).”
http://www.collerinacobalt.com.au/about-hpa/
People can work out their own calculations with an OPEX that will be higher due to (a) but that will be all assumptions only, but at least $46.44 gives us a base figure to go from and if people want to add (Al2O3) to the equation which is easy enough to find in previous announcements in the testing, it will look very nice in a PFS for a JV partner.
Have added this link to an edited version of Tony Barton on Bulls & Bears from January 2018, worth listening to again.
https://drive.google.com/file/d/1w_oh_STJ6sR5hpDI3pQHvl-vUBMBEXlZ/view?usp=sharing
My comments/posts are based completely on my own experience thoughts and interpretation along with my current financial position at the time.
Conduct your own due diligence, consult a licensed financial advisor or broker before making any and all investment decisions. As usual all constructive criticism welcomed.Good luck to all that hold.
- Forums
- ASX - By Stock
- KRR
- Capex & Opex
Capex & Opex
-
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add KRR (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.001(8.33%) |
Mkt cap ! $13.75M |
Open | High | Low | Value | Volume |
1.2¢ | 1.3¢ | 1.2¢ | $51.72K | 4.296M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 630000 | 1.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.3¢ | 1876614 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
22 | 6200311 | 0.009 |
8 | 28480304 | 0.008 |
5 | 5799516 | 0.007 |
6 | 5100808 | 0.006 |
12 | 8038888 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 1100000 | 2 |
0.011 | 2390000 | 4 |
0.012 | 1242985 | 7 |
0.013 | 1846567 | 8 |
0.014 | 972413 | 7 |
Last trade - 16.10pm 22/11/2024 (20 minute delay) ? |
KRR (ASX) Chart |