I feel as though generating electricity with onsite gas generators instead of waiting for the pipeline to arrive might be an answer (Just a thought)
AN1 CuFe sells its Crossroads gold royalty to Northern Star for $4M cash; says better than waiting for mine launch
Week 46 Wrap: Copper hits 2mth low as Trump threatens net zero pace; US rally fades; HotCopper’s picks