AEE 3.23% 15.0¢ aura energy limited

Ann: Haggan Vanadium Project Update, page-160

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 386 Posts.
    lightbulb Created with Sketch. 30
    Google translate. Seems to be about tailings dams. Cheap ones and how they bust.
    ..... Here's some:

    Mine damages, my article in swedish languageIn a short time, several damages have occurred in different parts of the world and caused major disasters. Most accidents have been caused by dams, by so-called "Upstream construction". Upstream built mining dams mean that the rise of the pond is partly made on the enrichment sand closest to the pond and partly on the previous year's pond crown. The name derives from the fact that the dust crown moves in the upstream direction in relation to the crest of the starting pond. The advantage for the operator with upstream built-up pond is that it is a cheap and simple pond construction. The upstream construction is characterized by fast construction time and thus quick start-up of mining operations. The probability of dam breaks also varies with the age of the mine. The main drawbacks of the design are a general low relative density with high water saturation, which places high control requirements on the port pressure line. Upstream built mining dams also have low resistance to seismic activities and they are…
 
watchlist Created with Sketch. Add AEE (ASX) to my watchlist
(20min delay)
Last
15.0¢
Change
-0.005(3.23%)
Mkt cap ! $107.4M
Open High Low Value Volume
15.0¢ 15.3¢ 14.5¢ $51.13K 340.9K

Buyers (Bids)

No. Vol. Price($)
1 5795 15.0¢
 

Sellers (Offers)

Price($) Vol. No.
15.5¢ 29029 2
View Market Depth
Last trade - 16.10pm 22/11/2024 (20 minute delay) ?
AEE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.