Plus some money to have another go at #2 well in Uruguay which already has approvals in place ... but hopefully with better equipment, technique, location or whatever it is we need to bring some hydrocarbons up
"Encountered unexpected geological fault" was the reason for the stoppage last time I recall?
Maybe they need to find a drill site away from the fault somehow or is that whole basalt structure the same? hope not.
- Forums
- ASX - By Stock
- PRL
- new ASX CODE
new ASX CODE, page-20
-
- There are more pages in this discussion • 45 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add PRL (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $48.44M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
PRL (ASX) Chart |
Day chart unavailable