Strata-X Energy Ltd. (SXA) reported an update on the drilling operations of CSG well 19B-1, the first well in a 100% owned tenement located within the Company’s interpreted high graded area of the Botswana CSG fairway. The 19B-1 well has been cased and cemented to 330 metres with cement pressure tests indicating a superior cement bond enabling the well to be set up as a producer in the future. Between 415-421 metres bright coals and gas bubbles in the return flow, along with water, were encountered