If the basement is around 750m and they are currently at 465m. That still allows 285m from those numbers until basement.
I see it as if they don't hit brine in the next 93 metres (a depth of 558m) then DH2 intercept will be less than DH1. If it is the roughly the same intercept, then very rough numbers to infer...
Length: 15km
Width: 4km
Thickness: 192m
Volume = 11.5B m3
Li: 802mg/l
DP: 0.075%
Li Conversion: 5.323
11.5B m3 x 0.000802 x 0.075 x 5.323
3.68 MT LCE
- Forums
- ASX - By Stock
- GLN
- Ann: Drilling Update
Ann: Drilling Update, page-132
-
- There are more pages in this discussion • 198 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add GLN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $60.50M |
Open | High | Low | Value | Volume |
14.0¢ | 14.5¢ | 13.5¢ | $232.3K | 1.669M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
23 | 2178553 | 13.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 746751 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 50000 | 0.115 |
7 | 472031 | 0.110 |
11 | 947628 | 0.105 |
25 | 1490999 | 0.100 |
2 | 20000 | 0.099 |
Price($) | Vol. | No. |
---|---|---|
0.125 | 1573785 | 9 |
0.130 | 254710 | 7 |
0.135 | 293280 | 3 |
0.140 | 225541 | 3 |
0.145 | 344396 | 6 |
Last trade - 16.10pm 22/11/2024 (20 minute delay) ? |
GLN (ASX) Chart |