Thanks for your answer ! very interesting, looking forward to capex estimates for the new port and to transport costs per tonne estimates in the feasibility study. it is unfortunate the toliara resource is less valuable per tonne of ore than kwale (less rutile/zircon, more lower value ilmenite), but i guess you can still make money with ilmenite if costs are right (favourable simple metallurgy/flow sheet, low stripping ratio, high grade continuous mineralization) coupled with huge economies of scale. time will tell.
- Forums
- ASX - By Stock
- BSE
- Ann: Presentation - Arlington Pre-daba
Ann: Presentation - Arlington Pre-daba, page-18
-
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add BSE (ASX) to my watchlist
(20min delay)
|
|||||
Last
19.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $313.0M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
BSE (ASX) Chart |
Day chart unavailable