EDE 0.00% 0.2¢ eden innovations ltd

Opinion from MB, page-12

  1. 5,928 Posts.
    lightbulb Created with Sketch. 311
    I think that some customers like the GDOT and FHWA are willing to take an increase in up front costs as a trade off against decreased maintenance costs. Other customers like precasters and shotcreters see the main benefit of early strength, reduced cement and reduced shrinkage. They have no need of increased final strength, as long as it meets required specifications. Additional strength is simply "wasted", unless the engineers redesign the bridge beams to take advantage of it.

    Adapting is what they are doing.
 
watchlist Created with Sketch. Add EDE (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $8.216M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $1K 500K

Buyers (Bids)

No. Vol. Price($)
60 137233047 0.1¢
 

Sellers (Offers)

Price($) Vol. No.
0.2¢ 13502282 13
View Market Depth
Last trade - 10.02am 18/11/2024 (20 minute delay) ?
EDE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.