This time management need to release BFS2.0 to the market with the funding locked in. It was Simon Coxhell's fatal mistake on BFS1.0 and the share price went into free fall as a result. Maca locked in as mining contractor and plant refurb is a good start. I hope they have addressed the severe lack of power in the comminution circuit which was the Achilles heal of that plant when the ore got hard back in Navigator days - hard ore (and low grade).
EAR Price at posting:
23.0¢ Sentiment: Buy Disclosure: Held