I left Spain out because of lack of information and progress by Black Dragon. However, now that the PEA has come through, it needs re-visiting.
Good to see the grade is much better than initially expected from 45 to 59 AU grams per tonne and LOM increased from 10 to 14 years. The next hurdle is the pre-feasibility study, which is due in October.