Kohinoor moves from B3 to B2, 31 Jan (probably loading ~17kt @B3 (28-31 Jan, ~4 days)).
Kohinoor then moves from B2 to Sea, 2 Feb (probably loading ~11.5kt @ B2 (31 Jan - 2 Feb, ~3 days)).
Kohinoor has capacity of ~32kt
So could we be currently loading the ~17kt @B3 (Qube hiring MRL equipment)? And then loading ~11.5kt @ B2 (Rotabox)? That would then be the ~28kt shipment for this Quarter (at least).
Switching berths to work around other ship schedules?