The transport costs should be low. The infrastructure in Malawi is good by African standards. SVM puts the cost of transport to the port of nacala at US$ 66/t. That is low.
There is also the possibility to drive on well-developed roads. Today's report states that:
Recently refurbished rail line to Nacala Port: MOU signed with rail concessionaire - drafting of full transport greement currently underway.
High quality existing road network to site: mostly bitumen with ~10km all-weather gravel road.
10km from planned Bunda electricity sub-station, 44km from new Nkhoma sub-station: grid power provision slated for 2024.
We will certainly soon have a binding agreement with the railway operator.
- Forums
- ASX - By Stock
- SVM
- Ann: High-Grade, Broad & Widespread Rutile Potential in Malawi
Ann: High-Grade, Broad & Widespread Rutile Potential in Malawi, page-23
-
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add SVM (ASX) to my watchlist
(20min delay)
|
|||||
Last
78.0¢ |
Change
0.005(0.65%) |
Mkt cap ! $380.9M |
Open | High | Low | Value | Volume |
78.0¢ | 78.0¢ | 78.0¢ | $31.45K | 40.32K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 4400 | 78.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
78.5¢ | 8886 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 30000 | 0.085 |
1 | 31479 | 0.082 |
1 | 50000 | 0.080 |
1 | 50000 | 0.077 |
1 | 50000 | 0.076 |
Price($) | Vol. | No. |
---|---|---|
0.090 | 65992 | 1 |
0.092 | 94860 | 2 |
0.093 | 61500 | 1 |
0.094 | 100000 | 1 |
0.095 | 91426 | 2 |
Last trade - 10.13am 27/11/2024 (20 minute delay) ? |
SVM (ASX) Chart |