No, I'm just saying that if you look at the limits of LOM pit design on page 14 of the feasibilty study most of the indicated resource sits within the pit shell and presumably also the measured resource which together make up 61% of the resource at Gilbey's. Look at the figure. Some of the indicated resource sits below the LOM pit shell as well, so it's probably less than 61%. The 98koz only relates to the area of grade control drilling as previously explained and as far as I can tell (I could ben wrong but that's the way I read it).Esh
GCY Price at posting:
16.0¢ Sentiment: None Disclosure: Not Held