CTP 3.85% 5.0¢ central petroleum limited

Dukas-1 Timeframe Indication from Santos, page-13

  1. 195 Posts.
    lightbulb Created with Sketch. 11
    Thanks OGP for the nice overlay and Ash for your comments. Looks like Dukas is about 220km of sealed road and an unknown quantity of unsealed from Alice Springs, so logistics won't be simple for drilling. So 200km minimum from the existing pipelines to the north and 800 km across more difficult terrain physically and logistically to Moomba if we need to shift large volumes of gas post drilling. But wouldn't that be a great problem to have. Would be interested in whether others think that connecting to Moomba is the only realistic pipeline solution if we do hit it big, compared to upgrading of northern pipes and NGP (and would this be likely faster or slower to get built if negotiation required between all involved pipeline providers. Yes, I know its a pipe dream...
 
watchlist Created with Sketch. Add CTP (ASX) to my watchlist
(20min delay)
Last
5.0¢
Change
-0.002(3.85%)
Mkt cap ! $37.74M
Open High Low Value Volume
5.2¢ 5.3¢ 5.0¢ $73.94K 1.456M

Buyers (Bids)

No. Vol. Price($)
1 1481 5.0¢
 

Sellers (Offers)

Price($) Vol. No.
5.5¢ 421806 1
View Market Depth
Last trade - 16.10pm 29/11/2024 (20 minute delay) ?
CTP (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.