Hello Josh I hope you are well
I saw the air bridge at the airport - described as part of the project - is actually being done by Georgiou.
https://blog.plantminer.com.au/wa-perth-airports-new-pedestrian-bridge-to-be-built-by-georgiou-group
In relation to tunnel - FAL project - here is more reassurance of diligence to safety concerns
https://www.abc.net.au/news/2018-11...ield-perth-airport-link-safety-fears/10545772
“Safety on project defended
In a statement, project director Richard Graham said the link was being constructed to "international standards" and every step was subjected to quality assurance.
WorkSafe has completed more than 35 inspections since construction started and last inspected the sites on November 9. There were no notices raised," Mr Graham said.
"We operate eight open sites and provide union access to relevant areas three to four times every week. Unions have made almost 300 visits to our sites since construction commenced.”....
- Forums
- ASX - By Stock
- NWH
- That $6bn TenderBook...
That $6bn TenderBook..., page-157
-
- There are more pages in this discussion • 108 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add NWH (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.95 |
Change
0.030(0.77%) |
Mkt cap ! $1.574B |
Open | High | Low | Value | Volume |
$3.97 | $3.98 | $3.92 | $2.104M | 533.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 14160 | $3.93 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$3.95 | 10387 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5058 | 2.370 |
4 | 18795 | 2.360 |
4 | 37687 | 2.350 |
1 | 7879 | 2.340 |
3 | 24992 | 2.330 |
Price($) | Vol. | No. |
---|---|---|
2.390 | 11634 | 3 |
2.400 | 71958 | 7 |
2.410 | 16085 | 2 |
2.420 | 19941 | 3 |
2.460 | 816 | 1 |
Last trade - 16.10pm 22/11/2024 (20 minute delay) ? |
NWH (ASX) Chart |