EWC 43.8% 2.3¢ energy world corporation ltd

No connection till 2020 !!, page-4

  1. 108 Posts.
    lightbulb Created with Sketch. 18

    Yes,a interesting article, just to clarify,  yes it will take 12months to completely finish the tank and become opperational. Yes the Ocean Quest is fully functional now and has the same capacity  as the on shore tank.Yes as soon as the right away land has been purchased ,(which is reportedly very close to completion) ,the Philippines bank will release the loan. Yes the construction of the dedicated line to the new designated  substation  site  will allow for a immediate  connection of 200MW into the grid and a immediate  400MW connection  with a bar connection into the current existing grid at the new substation site. Yes the 650MW connection must wait until the new substation is completed.  Yes the line and the new substation  will allowEWCto connect and supply up to 2100MW with that setup.

    Cheers Doc 

 
watchlist Created with Sketch. Add EWC (ASX) to my watchlist
(20min delay)
Last
2.3¢
Change
0.007(43.8%)
Mkt cap ! $29.24M
Open High Low Value Volume
1.9¢ 2.3¢ 1.8¢ $61.90K 2.956M

Buyers (Bids)

No. Vol. Price($)
1 27099 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.5¢ 555249 3
View Market Depth
Last trade - 16.10pm 22/11/2024 (20 minute delay) ?
EWC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.