"The actual JV T&C's wont be materially different to what the binding Term Sheet already states."
Essentially, the broad points will remain the same - I agree with you on that. Specifically, the percentage of equity Simulus will receive after each stage, and the royalty payments. But time frames may change: they still don't have a licence to drill vegetated or wetland areas so no scoping study (or term sheet) will be finalised until then most likely. If Simulus wants a full study, they need full drilling results - that means more RC drilling. So gotta get the rig back from Pebas as well.
I want to make as much money as the next man, but going in with your hand over your face [the picture of you above] might leave you open to missing something that is significant in terms of when real interest and cash is likely to start flowing in
- Forums
- ASX - By Stock
- CTM
- Ann: Centaurus Secures Nickel-Cobalt Development JV at Itapitanga
Ann: Centaurus Secures Nickel-Cobalt Development JV at Itapitanga, page-89
-
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add CTM (ASX) to my watchlist
(20min delay)
|
|||||
Last
42.5¢ |
Change
-0.005(1.16%) |
Mkt cap ! $205.9M |
Open | High | Low | Value | Volume |
43.0¢ | 43.0¢ | 42.0¢ | $34.45K | 80.53K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 44989 | 42.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
43.0¢ | 1235 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 21524 | 0.370 |
1 | 50000 | 0.355 |
1 | 28000 | 0.350 |
3 | 58210 | 0.345 |
2 | 19000 | 0.340 |
Price($) | Vol. | No. |
---|---|---|
0.380 | 7000 | 1 |
0.395 | 22197 | 3 |
0.400 | 61978 | 2 |
0.420 | 15331 | 2 |
0.430 | 10000 | 1 |
Last trade - 15.28pm 15/11/2024 (20 minute delay) ? |
CTM (ASX) Chart |