Funnily enough, we got this update before Strategic Min had even announced it, that's a first for quite some time in regards to Redmoor?.
Still only circa $5.5m MC. Plenty of room to move if the switch gets flicked.
Large increase in tonnage and grade is a given, it's just a matter of how much they can increase it within these 2 drill programs. This line is a key giveaway :
"Distribution of the various metals is demonstratingzonation within the structure, which is typical of large mineralised systems supporting the upside potential of theproject".
Likely to be more upside even after they have done the next resource model upgrade, save for a later date.
- Forums
- ASX - By Stock
- NAE
- Ann: Spectacular Grade Intercepts at Redmoor Tin-Tungsten Project
Ann: Spectacular Grade Intercepts at Redmoor Tin-Tungsten Project, page-7
-
- There are more pages in this discussion • 68 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add NAE (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
-0.001(16.7%) |
Mkt cap ! $7.175M |
Open | High | Low | Value | Volume |
0.6¢ | 0.6¢ | 0.5¢ | $9.346K | 1.703M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
25 | 12594765 | 0.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.6¢ | 14636448 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 2200000 | 0.006 |
9 | 8299899 | 0.005 |
6 | 3650000 | 0.004 |
3 | 2622888 | 0.003 |
3 | 4000100 | 0.002 |
Price($) | Vol. | No. |
---|---|---|
0.007 | 2536904 | 6 |
0.008 | 3066187 | 5 |
0.009 | 1057001 | 6 |
0.010 | 5904545 | 3 |
0.011 | 500000 | 1 |
Last trade - 16.10pm 07/11/2024 (20 minute delay) ? |
NAE (ASX) Chart |