Not very impressed to see redesign already happening but better to do early in production before units are sold and spares are inventoryed
From quarterly
This will coincide with a product upgrade to Terra Dura®. The introduction of a new sealing arrangement as well as the strengthening of both inner and outer polymer covers are measures to further improve durability and reliability of the brake
So are they talking water seals on claming covers of drum or bearing seals and considering their testing I suspect they just needed product to market so they could raise but new design changes were needed. Failures already happened? Redesign is a burden especially if any decertification is required. Redoing molds etc all costs time and money.
- Forums
- ASX - By Stock
- ABV
- Ann: Appendix 4C - quarterly
Ann: Appendix 4C - quarterly, page-10
Add ABV (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.9¢ |
Change
-0.001(1.11%) |
Mkt cap ! $28.70M |
Open | High | Low | Value | Volume |
8.8¢ | 8.9¢ | 8.8¢ | $3.985K | 45K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 3072 | 8.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.0¢ | 249494 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 131787 | 0.012 |
1 | 100000 | 0.010 |
1 | 700561 | 0.009 |
2 | 10000000 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 371498 | 2 |
0.015 | 528000 | 2 |
0.016 | 119374 | 2 |
0.017 | 687500 | 3 |
0.019 | 575000 | 1 |
Last trade - 15.14pm 22/11/2024 (20 minute delay) ? |
ABV (ASX) Chart |