There’s no way on earth they’ll have put 3000 tonnes through the plant.
If they’ve brought 3000 tonnes to surface and shipped half that to the mill it’d be a good result.
They’ll be waiting to get enough ore at plant for whatever batch size they need for the toll treatment before they process anything.