From The.Company European LIthium.
The Company aims to have increased Measured and Indicated resources for the definitive feasibility study (DFS), so that project design and evaluation will be at a mining rate of approximately 800,000 t/a, further increasing the mine life.
The DFS will commence in Q3 2018 and is anticipated to be completed Q1 2019.
Construction could start as early as 2019 and lithium hydroxide production by the end of 2021.
https://europeanlithium.com/wolfsberg-lithium-project/
- Forums
- ASX - By Stock
- EUR
- Visualizing the Rise of the Electric Vehicle and Lithium Production
Visualizing the Rise of the Electric Vehicle and Lithium Production, page-6
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add EUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
3.7¢ |
Change
0.004(12.1%) |
Mkt cap ! $57.32M |
Open | High | Low | Value | Volume |
3.5¢ | 3.8¢ | 3.5¢ | $100.7K | 2.823M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 114482 | 3.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.7¢ | 101908 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 235000 | 0.037 |
5 | 707518 | 0.036 |
8 | 210721 | 0.035 |
4 | 102072 | 0.034 |
4 | 90782 | 0.033 |
Price($) | Vol. | No. |
---|---|---|
0.040 | 200000 | 1 |
0.041 | 300000 | 2 |
0.042 | 549599 | 3 |
0.043 | 564000 | 3 |
0.044 | 100000 | 1 |
Last trade - 11.11am 29/11/2024 (20 minute delay) ? |
EUR (ASX) Chart |