    I can't see there'll be a requirement for significant on-going water release - the Pumped Hydro is effectively a closed loop, the main additions and subtractions being rain and evaporation. Therefore I'd guess the water release would be during the construction phase, e.g. to reduce the water level in the lower pit so that it doesn't interfere with the construction of the power station cavern and tunnels.