Not a lot new here except heavily underlined 'strong initial gas flows' for PV13 drilling.
Slide 18. Palm Valley "Mitigate pipeline constraint (Phase 2 capacity)" is surprising.
This suggests lifting PV's output from 15Tj/d to 20Tj/d is pipe capacity limited.
I assume this refers to field collection pipelines, not Amadeus-Darwin. That should be straightforward, though the extra engineering work has to be done and capex spent.
My 18.5c 'floor' delayed. Oh well.
Ash
- Forums
- ASX - By Stock
- CTP
- Ann: Latest Company Presentation
Ann: Latest Company Presentation, page-2
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $37.74M |
Open | High | Low | Value | Volume |
5.5¢ | 5.5¢ | 5.4¢ | $114.6K | 2.083M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 427045 | 5.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 160543 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 55500 | 0.135 |
9 | 1167237 | 0.130 |
8 | 593133 | 0.125 |
19 | 902443 | 0.120 |
1 | 86000 | 0.115 |
Price($) | Vol. | No. |
---|---|---|
0.140 | 787079 | 9 |
0.145 | 1062465 | 10 |
0.150 | 344400 | 6 |
0.160 | 125481 | 8 |
0.165 | 497623 | 5 |
Last trade - 16.10pm 22/11/2024 (20 minute delay) ? |
CTP (ASX) Chart |